Aluminium Extrusions

Lipped Channel
Lipped Channel
Aluminium Lipped ChannelMetric (mm)Kg/m
Die NumberABCD
7556LCH4.054.050.550.580.018
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

7925LCH5.505.501.001.000.042
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2678LCH5.505.001.001.000.041
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3928LCH6.356.351.001.430.055
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

8471LCH6.356.601.00/0.800.450.050
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4262LCH7.005.501.00/3.201.000.077
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4346LCH7.803.251.251.000.040
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7538LCH7.807.801.351.150.084
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5408LCH8.136.351.021.140.057
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3716LCH8.501.850.750.500.023
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

2686LCH9.503.000.752.250.042
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

5239LCH9.503.100.752.300.041
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

4492LCH10.003.000.902.600.047
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

3888LCH10.6012.701.021.410.098
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

1660LCH11.116.371.202.370.085
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2163LCH11.5011.501.002.250.100
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

9625LCH11.953.101.40/1.201.200.063
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

9092LCH12.003.001.001.000.048
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

9148LCH12.003.201.301.300.061
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2126LCH12.304.901.102.500.074
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2959LCH12.503.001.001.000.050
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4789LCH12.704.701.50/2.001.000.095
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2307LCH12.705.161.572.410.105
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7438LCH12.709.531.001.500.089
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6400LCH13.203.001.400.800.063
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5094LCH13.4011.501.500.200.147
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7938LCH14.0013.001.202.800.141
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6770LCH14.0020.001.602.650.242
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7970LCH14.505.500.711.230.051
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

1649LCH14.5010.001.502.500.149
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4245LCH14.808.501.203.050.117
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4242LCH14.8014.801.203.050.158
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2946LCH14.835.830.911.200.066
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

2572LCH15.0010.001.504.500.167
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2140LCH15.507.501.002.500.091
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

1372LCH15.8812.701.950.620.176
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2009LCH16.009.502.001.500.159
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7941LCH16.0023.102.00/1.302.800.327
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

8422LCH16.605.501.301.850.117
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2764LCH16.505.051.503.450.131
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6998LCH16.5012.502.002.500.259
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7070LCH16.6430.482.794.390.650
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

1801LCH16.654.751.504.080.127
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

0057LCH18.007.202.002.000.177
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5950LCH18.0011.701.003.000.123
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4109LCH18.0012.001.003.000.125
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

8260LCH18.0013.001.503.000.191
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6075LCH19.0019.001.604.900.276
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4665LCH19.059.531.203.500.138
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5409LCH19.059.651.193.510.138
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3217LCH19.0511.051.594.760.205
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6683LCH19.0519.051.593.290.261
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

0005LCH19.505.001.50/2.005.000.155
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2233LCH20.0020.002.004.000.346
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2595LCH20.009.002.004.000.228
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4443LCH20.0010.002.00/3.002.500.279
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4118LCH20.0012.001.802.700.224
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2687LCH20.0012.502.503.500.267
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2233LCH20.0020.002.004.000.346
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3322LCH20.0020.001.593.910.279
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

0049LCH20.209.201.605.200.199
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5842LCH21.346.601.273.560.133
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4199LCH22.005.001.652.000.163
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4239LCH22.0022.001.506.500.316
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2349LCH22.259.501.204.930.151
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

1367LCH22.505.001.251.000.108
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6401LCH23.003.001.400.800.100
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5784LCH23.0023.002.505.000.500
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3367LCH24.0014.004.00 /3.003.000.491
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7178LCH24.886.930.750.750.078
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A

1176LCH25.005.001.000.700.093
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

1374LCH25.005.001.000.700.093
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6415LCH25.005.502.50/2.002.000.219
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3445LCH25.0010.003.50/2.504.000.398
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6646LCH25.0011.003.00/2.001.250.295
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2454LCH25.0035.003.002.750.771
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4034LCH25.4011.181.52/3.303.050.325
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2825LCH25.4012.002.252.450.310
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3428LCH29.006.001.503.500.185
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7510LCH27.0014.503.004.000.472
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3459LCH28.008.502.504.500.333
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2543LCH29.006.502.006.000.272
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5368LCH32.0012.002.005.000.309
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

6102LCH34.004.001.00/1.802.100.133
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7552LCH34.1016.903.00/3.905.650.779
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4947LCH34.295.842.033.780.265
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2756LCH31.0035.005.00/4.006.701.255
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

1118LCH35.3011.171.277.620.250
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

5030LCH35.406.001.40/1.903.000.199
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

3401LCH36.0017.503.50/4.004.500.730
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

8166LCH38.007.003.00/1.508.500.313
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7388LCH38.008.003.00/2.004.000.632
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2045LCH38.0032.006.00/5.009.001.621
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

7997LCH40.126.081.015.080.163
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4279LCH42.5015.507.755.380.929
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 2014A 2024 3003 6060 6063 6005A 6061 6082 7020 7050 7075

1807LCH45.0014.001.0011.000.251
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

4460LCH47.0012.003.006.500.636
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

9764LCH48.0021.007.005.001.670
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 2014A 2024 3003 6060 6063 6005A 6061 6082 7020 7050 7075

4330LCH52.0022.502.008.000.646
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

2037LCH55.0045.002.005.000.815
Extruded to order – standard lead time 1-2 weeks

Extrudable in the following alloys: 1050 1200 3003 6060 6063 6005A 6061 6082

Capital Aluminium Extrusions Limited
Cleator Moor, Cumbria,
CA25 5QB, UNITED KINGDOM.